Steel FixingBasement Raft & Retaining Walls
London
Reinforced concrete raft with steel fixing to the retaining walls and starter bars, tied and ready for the next concrete pour.
Portfolio
A selection of homes, developments and commercial spaces delivered by K777ORBI.
Steel FixingLondon
Reinforced concrete raft with steel fixing to the retaining walls and starter bars, tied and ready for the next concrete pour.
ConcreteLondon
Cast in-situ lift-core walls with continuity rebar left proud for the following lift. Tower crane on standby for the next concrete load.
ConcreteLondon
Structural columns and shear walls cast around the ground-floor slab, with vertical starter bars ready to tie into the next floor's steel.
Steel FixingLondon
Full slab reinforcement mat fixed over the blinding and edge shuttering — the finished steel layer that a large ground-floor slab is poured over.
Steel FixingLondon
Prefabricated foundation-beam cages tied off-site and laid out on the slab alongside service ducts, ready to be dropped into their trenches.
GroundworksLondon
Live foundation pour supported by a mobile crane and concrete wagon during a full working day on site.
PlanningLondon
3D site logistics plan showing building footprint, working area, parking and site access — the kind of coordination we run before boots hit the ground.
PlanningLondon
3D site logistics render showing a multi-storey commercial building with dedicated college parking, vehicle access and temporary works layout.